10–400 kVA, sixth-generation DSP control, distributed active paralleling to six units. No central bypass cabinet.
Three-phase & industrial UPS
Where the load is a building, a production line or a remote site rather than a rack. The real decision at this size is not the brand — it is high frequency or low frequency, and whether redundancy is bought as a second unit or as a module inside the first one.
Platforms
Every platform below has a full specification table — including models that are not in the brochure.

Online UPS
10–400 kVA, sixth-generation DSP control, distributed active paralleling to six units. No central bypass cabinet.

Online UPS
The compact end: tower chassis, built-in batteries at 10–20 kVA, output switchable between 380/400/415 V and 208 V.

Online UPS
Power-module design with three-level conversion, ≥94.5% efficiency, parallels to four frames.

Modular UPS
N+X from hot-swappable 30 or 50 kVA modules, 96% efficiency, capacity added one module at a time.

Online UPS
Full-bridge low-frequency topology with an output isolation transformer — survives what high-frequency units trip on.

Online UPS
UPS, battery and climate control in one IP55 cabinet, −40 to 55 °C, for towers and roadside sites.
What you are paying for
A transformerless unit is smaller, roughly 96% efficient and cheaper per kVA. A low-frequency unit with an output isolation transformer is heavier, two to three points less efficient, and rides through the surges and poor neutral bonding that industrial sites produce. TD and GT DP sit on that second side.
GP33 parallels to six units, ST33 60–160 kVA to four, and RM adds capacity one 30 or 50 kVA hot-swappable module at a time. N+1 is a configuration, not a separate purchase decided at tender stage.
208 V three-phase, 440/460/480 V, 60 Hz — all set at the factory, never in the field. Tell us at enquiry stage; a 460 V hospital in the Philippines is a standard GP33 frame with a custom output.
Selection
Written the way a quote request usually arrives: a load, a room and a voltage.
| If the site is | Topology | Platform |
|---|---|---|
| A data centre or IT room, 10–160 kVA | Power-module or modular | ST33 / RM |
| A production line with motors and dirty neutral | Low frequency + isolation transformer | TD 3–40 kVA |
| Building-wide, 100–400 kVA, redundancy by parallel | Transformerless, parallel to 6 | GP33 10–400 kVA |
| Growing by module rather than by unit | Modular N+X, hot swap | RM 30–600 kVA |
| A tower or roadside cabinet with no plant room | Outdoor IP55 cabinet | OTD110 1–10 kVA |
| 208 V three-phase (North America, parts of LatAm) | Dual capacity — halves at 208 V | ST33 10–40 kVA |
Capacity at 208 V is not the same number as at 380/400 V. The ST33 10–40 kVA page states both, so you size against the voltage the site actually has.