SHINPOWIN™Power Protection Request a quote

Selection FAQ

The questions that decide a UPS order

Sizing, runtime, generators, non-standard voltages, paralleling, batteries and paperwork. Written by the people who answer these by email every day — with the arithmetic shown, so you can check it against your own load list.

How do I convert my load into a UPS rating?

Add the running loads in watts, not the nameplate kVA of the equipment. Then divide by the output power factor of the UPS you are buying, not by 0.8 out of habit.

On our GT, RT, RM and GP33 platforms the output power factor is 1.0, so a 10 kVA unit carries 10 kW. On the TD low-frequency range it is 0.8, and a 10 kVA unit carries 8 kW. Quoting the wrong assumption is the most common way a UPS ends up undersized.

Online, line-interactive or offline — which do I actually need?

An online UPS regenerates the output continuously; the load never runs on raw mains. Use it for servers, medical equipment, instruments and anything that reboots badly.

A line-interactive unit (our SO Series) passes mains through with AVR correction and switches to inverter on failure, with a transfer time of a few milliseconds. For workstations, POS terminals, routers and office equipment that is usually enough, and it costs less.

What runtime should I specify?

Runtime is a battery size, not a UPS feature: kWh of bank = load kW × hours ÷ (usable depth of discharge × inverter efficiency). A 10 kW load held for 30 minutes at 80% DoD and 90% efficiency needs about 6.9 kWh of nominal capacity.

If a generator backs the site, 5 to 15 minutes is the normal specification — enough to ride out the transfer and shut down cleanly if the generator fails. If there is no generator, size for the outage you actually get, not the one you hope for.

Will a UPS run on a generator?

Yes, and the details matter. Our input stages accept 40–70 Hz, and the modular and three-phase ranges have power walk-in so the rectifier ramps up instead of loading the generator in one step.

Size the generator at roughly 1.5 to 2 times the UPS rating. A generator sized exactly to the load will stumble when the UPS recharges a flat battery.

The site is 208 V, 440 V, 460 V or 480 V. Can you supply that?

Output voltage is set at the factory, so yes — but it has to be decided at the enquiry stage. On the ST33 10–40 kVA the output is switchable between 380/400/415 V and 208 V, and capacity halves at 208 V. The 460 V hospital in the Philippines is a GP33 frame with a custom output configuration.

Field conversion after delivery is not the same thing, and the mistake is normally discovered at commissioning.

50 Hz or 60 Hz?

Both. Frequency is configured with the output voltage on three-phase and large single-phase units, and the single-phase ranges sync to 40–70 Hz input automatically. Tell us the destination country rather than the frequency — it settles the plug, the voltage and the documentation together.

Can I add capacity or redundancy later by paralleling?

It depends on the platform: GP33 parallels to six units, ST33 60–160 kVA to four, RM adds hot-swappable 30 or 50 kVA modules into the same cabinet, and the SPI and VM II inverters parallel to six.

Paralleling requires the units to be ordered as parallel-capable and commissioned together. Adding a third unit to two existing ones is normal; adding paralleling to a unit bought as a stand-alone is not.

When is an isolation transformer worth the weight?

When neutral-to-earth voltage affects the load. Laboratory instruments, imaging equipment and control systems can read or behave differently on a supply with a noisy neutral, and an output isolation transformer (our PT and TD ranges, and the GT 6–20 kVA DP) removes that path.

The cost is efficiency and weight — roughly two to three points and a lot of kilograms. Do not specify it because it sounds safer; specify it because the load needs it.

LiFePO4 or lead-acid?

LiFePO4 wins on cycle life (≥4000 cycles on the LV range, 6000 on the HV Stack at 80% DoD) and on usable capacity, because you can discharge it deeply without shortening its life. Lead-acid still wins on first cost, and on sites where the bank will be replaced by whatever is available locally.

Our hybrid inverters are battery-agnostic within their voltage window, which is what makes the upgrade path practical: run lead-acid now, switch to lithium when the bank dies.

What certification comes with the units?

CE verification against the Low Voltage and EMC directives, tested by Global Testing Services, under certificate numbers CLHK26031783781 (SO, GT, SR, RT) and CLHK26040284803 (ST33, GP33, RM). Standards: EN IEC 62040-1, EN IEC 62040-2, EN IEC 61000-3-2 and EN 61000-3-3.

The CE mark itself is applied under our own EU Declaration of Conformity, which ships with every order. Ask for the certificate pack — verification statement, test reports and DoC — before you commit to a tender.

What documentation do the batteries ship with?

UN38.3 test summaries and MSDS for every battery model, which is what a forwarder will ask for before booking a container or an air shipment. Ask for them at quotation stage: a battery that cannot be documented is a shipment that does not move.

What are the lead time and the minimum order?

Standard models usually ship from stock or within a few weeks; custom output voltages, private-label orders and large battery banks are built to order. Minimum quantity depends on the platform — single units for most UPS models, a batch for private label.

Because both depend on what is already in production, ask for the current date with your enquiry rather than relying on a number on a web page.

Can you supply under our own brand?

Yes. Front panel, manual, carton and rating label carry your branding; the chassis, control platform and firmware stay ours, and the certification stays in our name so you can quote it in a tender.

You supply the artwork and the manual text, and decide the batch size. See the Russia private-label case for how that worked in practice.

What warranty applies?

UPS units: 12 months from shipment against manufacturing defects, with spare parts — fans, control boards, power modules — stocked for the models we ship most. HV Stack batteries: 5 years. SPI hybrid inverters: 3 years.

Support runs through your distributor in English, by email and video call, including selection and commissioning help.

Still open

Ask with your actual numbers

The load list, the site voltage and the runtime you need. That is enough to come back with a model rather than a range.

Need the certificate pack for a tender?

Verification statements, test reports and the EU Declaration of Conformity — send the models you are tendering and we will send the pack.

Request the pack
WhatsApp