The site was 460 V. The catalogue was not.
The Philippines distributes at 460 V three-phase in many commercial buildings — a voltage inherited from the US standard, not the 380/400/415 V our GP33 range leaves the factory set to. Adding a step-down transformer in front of the UPS would have cost floor space in a switch room that had none, and added a failure point to a hospital supply.
The hospital also could not accept a single point of failure: theatres, imaging and the records system all sit behind this supply. Two units in parallel, sharing the battery bank, give the load somewhere to go when one unit is serviced.
What we did: two GP33 500 kVA frames were built with a 460 V output configuration at the factory and commissioned in parallel on site, delivering 1,000 kVA of installed capacity with the redundancy a hospital load requires — from a platform that is otherwise a standard product.